WILLIAM MUISE
67%
3
Construction Permits
1
Currently Open
3
Rate-Eligible
permits > 1yr old
2016–2019
Years Active
Closure rate based on permits older than 1 year. “Issued” and “Stop Work” statuses are excluded.
Performance by Permit Type
Electrical2 rated
100.0% closed vs 60% median, 40.5 points higher
Low Voltage1 rated
0.0% closed vs 28% median, 28.2 points lower
Median based on all applicants with 20+ rated permits in each category. Only permits older than 1 year are rated.
Year-by-Year Summary
2019
0.0%
Open1
Closed0
0 closed / 1 rated
2016
100.0%
Open0
Closed2
2 closed / 2 rated
All Permits
3 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Open | ELV991470 | Electrical Low Voltage | 621 Huntington AV, Boston | Aug 20, 2019 | Feb 20, 2020 | $143,736.32 |
| Closed | E664903 | Electrical Permit | 7-13 Elkins ST, South Boston | Dec 13, 2016 | Jun 13, 2017 | $5,000 |
| Closed | E664906 | Electrical Permit | 775 Summer ST, South Boston | Dec 13, 2016 | Jun 13, 2017 | $5,000 |