Thien Le

67%
+17.4 vs 49% median
11
Construction Permits
4
Currently Open
9
Rate-Eligible
permits > 1yr old
2020–2026
Years Active

Closure rate based on permits older than 1 year. “Issued” and “Stop Work” statuses are excluded.

Performance by Permit Type

Electrical6 rated

83.3% closed vs 60% median, 23.3 points higher

Building2 rated

50.0% closed vs 30% median, 20.0 points higher

0.0% closed vs 28% median, 28.3 points lower

Median based on all applicants with 20+ rated permits in each category. Only permits older than 1 year are rated.

Year-by-Year Summary

2026(YTD)

Open1
Closed0

Too early to rate — permits need 1 year to mature

2025

Open0
Closed1

Too early to rate — permits need 1 year to mature

2024

50.0%
Open2
Closed2

2 closed / 4 rated

2023

100.0%
Open0
Closed2

2 closed / 2 rated

2022

100.0%
Open0
Closed1

1 closed / 1 rated

2021

0.0%
Open1
Closed0

0 closed / 1 rated

2020

100.0%
Open0
Closed1

1 closed / 1 rated

All Permits

11 permits
StatusPermit #AddressIssued
OpenE178899414 Lafield ST, DorchesterJan 12, 2026<1yr
ClosedE1718900425 Seaver ST, DorchesterMay 19, 2025<1yr
ClosedALT1588570317-319 Fuller ST, DorchesterNov 15, 2024
OpenE1588881317-319 Fuller ST, DorchesterApr 14, 2024
OpenSF1584818317-319 Fuller ST, DorchesterApr 9, 2024
ClosedE157536023 Lila RD, Jamaica PlainMar 7, 2024
ClosedE149706528 Blakeville ST, DorchesterJul 21, 2023
ClosedE14881627 Wayne ST, DorchesterJun 25, 2023
ClosedE138377850 Jacob ST, DorchesterAug 24, 2022
OpenELV120933363 Moore ST, East BostonJun 16, 2021
ClosedE1063462317-319 Fuller ST, DorchesterMay 21, 2020

See Other Applicants