SUN PANDH

39%
-10.8 vs 49% median
13
Construction Permits
8
Currently Open
13
Rate-Eligible
permits > 1yr old
2019–2022
Years Active

Closure rate based on permits older than 1 year. “Issued” and “Stop Work” statuses are excluded.

Performance by Permit Type

Plumbing11 rated

45.5% closed vs 63% median, 17.0 points lower

Gas2 rated

0.0% closed vs 58% median, 58.3 points lower

Median based on all applicants with 20+ rated permits in each category. Only permits older than 1 year are rated.

Year-by-Year Summary

2022

40.0%
Open3
Closed2

2 closed / 5 rated

2020

0.0%
Open2
Closed0

0 closed / 2 rated

2019

50.0%
Open3
Closed3

3 closed / 6 rated

All Permits

13 permits
StatusPermit #AddressIssued
OpenPL1427920161-171 Cambridge ST, BostonDec 28, 2022
ClosedPL136947575 Blossom ST, BostonAug 1, 2022
OpenG136887675 Blossom ST, BostonJul 29, 2022
OpenPL136887575 Blossom ST, BostonJul 29, 2022
ClosedPL1306367173-177 Cambridge ST, BostonMar 10, 2022
OpenPL1047090161-171 Cambridge ST, BostonFeb 3, 2020
OpenPL102495240-42 Piedmont ST, BostonJan 26, 2020
OpenPL968486777-793 Boylston ST, BostonNov 22, 2019
OpenG102574640-42 Piedmont ST, BostonNov 22, 2019
ClosedPL1004121173-177 Cambridge ST, BostonSep 29, 2019
ClosedPL1001040161-171 Cambridge ST, BostonSep 18, 2019
ClosedPL968524772-778 Boylston ST, BostonJun 25, 2019
OpenPL926686161-171 Cambridge ST, BostonFeb 27, 2019

See Other Applicants