Roy Recore
43%
7
Construction Permits
4
Currently Open
7
Rate-Eligible
permits > 1yr old
2013–2023
Years Active
Closure rate based on permits older than 1 year. “Issued” and “Stop Work” statuses are excluded.
Performance by Permit Type
Electrical6 rated
33.3% closed vs 60% median, 26.2 points lower
Building1 rated
100.0% closed vs 30% median, 70.1 points higher
Median based on all applicants with 20+ rated permits in each category. Only permits older than 1 year are rated.
Year-by-Year Summary
2023
100.0%
Open0
Closed2
2 closed / 2 rated
2019
0.0%
Open2
Closed0
0 closed / 2 rated
2015
0.0%
Open1
Closed0
0 closed / 1 rated
2014
100.0%
Open0
Closed1
1 closed / 1 rated
2013
0.0%
Open1
Closed0
0 closed / 1 rated
All Permits
7 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Closed | E1438437 | Electrical Permit | 180-190A Brighton AV, Allston | Feb 3, 2023 | Aug 3, 2023 | $6,000 |
| Closed | E1435658 | Electrical Permit | 180-190A Brighton AV, Allston | Jan 27, 2023 | Jul 27, 2023 | $500 |
| Open | E979894 | Electrical Permit | 75-79 Summer ST, Boston | Jul 26, 2019 | Jan 26, 2020 | $600 |
| Open | E948191 | Electrical Permit | 315 Centre ST, Jamaica Plain | May 3, 2019 | Nov 3, 2019 | $3,800 |
| Open | E491202 | Electrical Permit | 315-333 Washington ST, Boston | Jul 9, 2015 | Jan 9, 2016 | $6,023 |
| Closed | ERT357453 | Erect/New Construction | 76R Tyler ST, Hyde Park | Jun 19, 2014 | Dec 19, 2014 | $35,275 |
| Open | E266875 | Electrical Permit | 75-79 Summer ST, Boston | Jul 29, 2013 | Jan 29, 2014 | $500 |