Noel Heeran

39%
-10.8 vs 49% median
16
Construction Permits
18 total
10
Currently Open
13
Rate-Eligible
permits > 1yr old
2011–2026
Years Active

Closure rate based on permits older than 1 year. “Issued” and “Stop Work” statuses are excluded.

Performance by Permit Type

Building13 rated

38.5% closed vs 30% median, 8.5 points higher

Median based on all applicants with 20+ rated permits in each category. Only permits older than 1 year are rated.

Year-by-Year Summary

2026(YTD)

Open1
Closed0

Too early to rate — permits need 1 year to mature

2025

100.0%
Open1
Closed2

1 closed / 1 rated

2024

0.0%
Open1
Closed0

0 closed / 1 rated

2023

100.0%
Open0
Closed2

2 closed / 2 rated

2022

40.0%
Open3
Closed2

2 closed / 5 rated

2012

0.0%
Open1
Closed0

0 closed / 1 rated

2011

0.0%
Open3
Closed0

0 closed / 3 rated

All Permits

18 permits
StatusPermit #AddressIssued
OpenSF180714828 Exeter ST, BostonJan 5, 2026<1yr
ClosedSF175429728 Exeter ST, BostonJul 31, 2025<1yr
OpenALT1691455867-871 Boylston ST, BostonMay 29, 2025<1yr
ClosedSF168190528 Exeter ST, BostonJan 15, 2025
OpenSF164929328 Exeter ST, BostonOct 2, 2024
ClosedSF154091228 Exeter ST, BostonNov 17, 2023
ClosedSF144982028 Exeter ST, BostonMar 23, 2023
ClosedSF142362428 Exeter ST, BostonDec 30, 2022
OpenSF142361528 Exeter ST, BostonDec 30, 2022
ClosedCOO141583216-18 Foster ST, BrightonDec 12, 2022
OpenSF138365028 Exeter ST, BostonSep 26, 2022
OpenSF137113728 Exeter ST, BostonAug 24, 2022
ClosedSF132344528 Exeter ST, BostonMay 19, 2022
ClosedSF184776815-819 Morton ST, MattapanSep 21, 2012
OpenSF16098215 Argyle TER, DorchesterJul 10, 2012
OpenSF8872192-100 Massachusetts AV, BostonAug 2, 2011
OpenSF6568815 Argyle TER, DorchesterMar 8, 2011
OpenSF6315314 Argyle TER, DorchesterFeb 8, 2011

See Other Applicants