malcolm barber

20%
-28.9 vs 49% median
5
Construction Permits
9 total
4
Currently Open
5
Rate-Eligible
permits > 1yr old
2010–2024
Years Active

Closure rate based on permits older than 1 year. “Issued” and “Stop Work” statuses are excluded.

Performance by Permit Type

Building5 rated

20.0% closed vs 30% median, 9.9 points lower

Median based on all applicants with 20+ rated permits in each category. Only permits older than 1 year are rated.

Year-by-Year Summary

2021

0.0%
Open1
Closed0

0 closed / 1 rated

2017

50.0%
Open1
Closed1

1 closed / 2 rated

2011

0.0%
Open1
Closed0

0 closed / 1 rated

2010

0.0%
Open1
Closed0

0 closed / 1 rated

All Permits

9 permits
StatusPermit #AddressIssued
ClosedCOO158954444 Ellery ST, South BostonApr 30, 2024
OpenSF1242158435 E Sixth ST, South BostonAug 26, 2021
OpenSF103680710 Wendeller ST, South BostonDec 27, 2019
OpenSF103680710 Wendeller ST, South BostonDec 27, 2019
ClosedCOO7936847 Baker CT, DorchesterJan 26, 2018
ClosedERT5959437 Baker CT, DorchesterJul 18, 2017
OpenFND6792667 Baker CT, DorchesterFeb 7, 2017
OpenSF64696179 W Fifth ST, South BostonFeb 18, 2011
OpenSF34280480 Ashmont ST, DorchesterJul 16, 2010

See Other Applicants