Justin Ezzideen

75%
+26.1 vs 49% median
8
Construction Permits
2
Currently Open
8
Rate-Eligible
permits > 1yr old
2017–2021
Years Active

Closure rate based on permits older than 1 year. “Issued” and “Stop Work” statuses are excluded.

Performance by Permit Type

Electrical6 rated

66.7% closed vs 60% median, 7.2 points higher

100.0% closed vs 28% median, 71.8 points higher

Median based on all applicants with 20+ rated permits in each category. Only permits older than 1 year are rated.

Year-by-Year Summary

2021

100.0%
Open0
Closed1

1 closed / 1 rated

2020

100.0%
Open0
Closed2

2 closed / 2 rated

2019

75.0%
Open1
Closed3

3 closed / 4 rated

2017

0.0%
Open1
Closed0

0 closed / 1 rated

All Permits

8 permits
StatusPermit #AddressIssued
ClosedE1208643414-416 Cambridge ST, AllstonJun 14, 2021
ClosedE1057425506-512A Park DR, BostonMar 3, 2020
ClosedELV1057429506-512A Park DR, BostonMar 2, 2020
OpenE99740964-74 Staniford ST, BostonSep 4, 2019
ClosedE935673414-416 Cambridge ST, AllstonApr 2, 2019
ClosedELV931171414-416 Cambridge ST, AllstonMar 27, 2019
ClosedE913016414-416 Cambridge ST, AllstonJan 8, 2019
OpenE774952462-468 Washington ST, BrightonNov 7, 2017

See Other Applicants