Jose Teixeira

40%
-8.9 vs 49% median
6
Construction Permits
7 total
4
Currently Open
5
Rate-Eligible
permits > 1yr old
2016–2025
Years Active

Closure rate based on permits older than 1 year. “Issued” and “Stop Work” statuses are excluded.

Performance by Permit Type

Gas2 rated

0.0% closed vs 59% median, 58.6 points lower

Plumbing2 rated

100.0% closed vs 63% median, 37.0 points higher

Building1 rated

0.0% closed vs 30% median, 29.9 points lower

Median based on all applicants with 20+ rated permits in each category. Only permits older than 1 year are rated.

Year-by-Year Summary

2025

Open1
Closed0

Too early to rate — permits need 1 year to mature

2021

0.0%
Open1
Closed0

0 closed / 1 rated

2018

33.3%
Open2
Closed1

1 closed / 3 rated

2017

100.0%
Open0
Closed1

1 closed / 1 rated

All Permits

7 permits
StatusPermit #AddressIssued
OpenSF174197645-47 Thompson ST, Hyde ParkJul 3, 2025<1yr
OpenSF126187545-47 Thompson ST, Hyde ParkOct 26, 2021
OpenG86141444 Gallivan BL, DorchesterAug 7, 2018
ClosedPL81072357 Batchelder ST, RoxburyMar 19, 2018
OpenG81073357 Batchelder ST, RoxburyMar 19, 2018
ClosedPL725009636A-636 Dorchester AV, South BostonJun 27, 2017
OpenSF58875748 Morrell ST, West RoxburyMay 9, 2016

See Other Applicants