John Beardsley
33%
5
Construction Permits
8 total
3
Currently Open
3
Rate-Eligible
permits > 1yr old
2022–2025
Years Active
Closure rate based on permits older than 1 year. “Issued” and “Stop Work” statuses are excluded.
Performance by Permit Type
Building3 rated
33.3% closed vs 30% median, 3.4 points higher
Median based on all applicants with 20+ rated permits in each category. Only permits older than 1 year are rated.
Year-by-Year Summary
2025
—
Open1
Closed1
Too early to rate — permits need 1 year to mature
2024
0.0%
Open1
Closed0
0 closed / 1 rated
2023
100.0%
Open0
Closed1
1 closed / 1 rated
2022
0.0%
Open1
Closed0
0 closed / 1 rated
All Permits
8 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Open | ALT1795797 | Long Form/Alteration Permit | 440 Brookline AV, Boston | Nov 18, 2025<1yr | May 18, 2026 | $722,238 |
| Closed | SF1723094 | Short Form Bldg Permit | 26 Exeter ST, Boston | Jun 12, 2025<1yr | Dec 12, 2025 | $151,000 |
| Open | SF1612514 | Short Form Bldg Permit | 677 Huntington AV, Boston | Jun 20, 2024 | Dec 20, 2024 | $150,000 |
| Closed | COO1574149 | Certificate of Occupancy | 243 Charles ST, Boston | Mar 7, 2024 | — | $1,871,380 |
| Closed | ALT1518527 | Long Form/Alteration Permit | 243 Charles ST, Boston | Sep 29, 2023 | Mar 29, 2024 | $1,871,380 |
| Closed | COO1321122 | Certificate of Occupancy | 220 Longwood AV, Boston | Jun 15, 2022 | — | $4,771,991 |
| Closed | COO1322037 | Certificate of Occupancy | 220 Longwood AV, Boston | May 20, 2022 | — | $0 |
| Open | ALT1254648 | Long Form/Alteration Permit | 220 Longwood AV, Boston | Jan 20, 2022 | Jul 20, 2022 | $4,519,991 |