Gonzalo Artigas

23%
-26.2 vs 49% median
15
Construction Permits
11
Currently Open
13
Rate-Eligible
permits > 1yr old
2017–2026
Years Active

Closure rate based on permits older than 1 year. “Issued” and “Stop Work” statuses are excluded.

Performance by Permit Type

Gas7 rated

14.3% closed vs 58% median, 44.0 points lower

Plumbing5 rated

40.0% closed vs 63% median, 22.5 points lower

Building1 rated

0.0% closed vs 30% median, 30.0 points lower

Median based on all applicants with 20+ rated permits in each category. Only permits older than 1 year are rated.

Year-by-Year Summary

2026(YTD)

Open1
Closed0

Too early to rate — permits need 1 year to mature

2025

Open0
Closed1

Too early to rate — permits need 1 year to mature

2023

50.0%
Open1
Closed1

1 closed / 2 rated

2022

50.0%
Open1
Closed1

1 closed / 2 rated

2020

0.0%
Open5
Closed0

0 closed / 5 rated

2019

33.3%
Open2
Closed1

1 closed / 3 rated

2017

0.0%
Open1
Closed0

0 closed / 1 rated

All Permits

15 permits
StatusPermit #AddressIssued
OpenG1819453460-468 Centre ST, Jamaica PlainFeb 10, 2026<1yr
ClosedPL17205061478-1484 Tremont ST, Mission HillMay 15, 2025<1yr
ClosedPL1545441104-106 Trenton ST, East BostonNov 16, 2023
OpenG1545442104-106 Trenton ST, East BostonNov 15, 2023
ClosedPL1418646318 Summit AV, BrightonDec 12, 2022
OpenPL13219851887-1893 River ST, Hyde ParkApr 21, 2022
OpenPL114175419 Ramsey ST, DorchesterDec 10, 2020
OpenG1134528285 Washington ST, DorchesterNov 10, 2020
OpenG1131964184-220 Border ST, East BostonOct 30, 2020
OpenG1131163377 Adams ST, DorchesterOct 28, 2020
OpenPL1074310285 Washington ST, DorchesterJul 9, 2020
OpenG99717637 White ST, East BostonSep 4, 2019
OpenSF95814188 Lake Shore RD, BrightonJun 19, 2019
ClosedG92454426 Vinton ST, South BostonFeb 27, 2019
OpenG702829184-220 Border ST, East BostonApr 27, 2017

See Other Applicants