gabriel wolloff
25%
4
Construction Permits
3
Currently Open
4
Rate-Eligible
permits > 1yr old
2019–2023
Years Active
Closure rate based on permits older than 1 year. “Issued” and “Stop Work” statuses are excluded.
Performance by Permit Type
Low Voltage4 rated
25.0% closed vs 28% median, 3.3 points lower
Median based on all applicants with 20+ rated permits in each category. Only permits older than 1 year are rated.
Year-by-Year Summary
2023
100.0%
Open0
Closed1
1 closed / 1 rated
2021
0.0%
Open1
Closed0
0 closed / 1 rated
2019
0.0%
Open2
Closed0
0 closed / 2 rated
All Permits
4 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Closed | ELV1487509 | Electrical Low Voltage | 376 Huntington AV, Boston | Oct 10, 2023 | Apr 10, 2024 | $107,747 |
| Open | ELV1241176 | Electrical Low Voltage | 440 Huntington AV, Boston | Aug 23, 2021 | Feb 23, 2022 | $7,140 |
| Open | ELV937425 | Electrical Low Voltage | 370 Huntington AV, Boston | Apr 16, 2019 | Oct 15, 2019 | $4,000 |
| Open | ELV919895 | Electrical Low Voltage | 1140 Boylston ST, Boston | Apr 16, 2019 | Oct 15, 2019 | $2,600 |