Frank Reynolds

17%
-32.2 vs 49% median
12
Construction Permits
10
Currently Open
12
Rate-Eligible
permits > 1yr old
2010–2012
Years Active

Closure rate based on permits older than 1 year. “Issued” and “Stop Work” statuses are excluded.

Performance by Permit Type

Low Voltage11 rated

18.2% closed vs 28% median, 10.0 points lower

Electrical1 rated

0.0% closed vs 60% median, 59.5 points lower

Median based on all applicants with 20+ rated permits in each category. Only permits older than 1 year are rated.

Year-by-Year Summary

2012

0.0%
Open4
Closed0

0 closed / 4 rated

2011

0.0%
Open5
Closed0

0 closed / 5 rated

2010

66.7%
Open1
Closed2

2 closed / 3 rated

All Permits

12 permits
StatusPermit #AddressIssued
OpenELV123153101-103 Summer ST, BostonMar 6, 2012
OpenELV123153101-103 Summer ST, BostonMar 6, 2012
OpenELV118531101-103 Summer ST, BostonFeb 8, 2012
OpenELV118531101-103 Summer ST, BostonFeb 8, 2012
OpenELV104399280-294 Congress ST, BostonNov 4, 2011
OpenELV80246214-218 Cambridge ST, BostonJun 7, 2011
OpenELV71990704-780 Washington ST, BostonApr 12, 2011
OpenELV71990704-780 Washington ST, BostonApr 12, 2011
OpenELV71990704-780 Washington ST, BostonApr 12, 2011
OpenE54095569 Boylston ST, BostonDec 3, 2010
ClosedELV360431312 Hyde Park AV, Hyde ParkJul 29, 2010
ClosedELV120811078-1080 Boylston ST, BostonJan 22, 2010