christopher garside
40%
5
Construction Permits
3
Currently Open
5
Rate-Eligible
permits > 1yr old
2017–2023
Years Active
Closure rate based on permits older than 1 year. “Issued” and “Stop Work” statuses are excluded.
Performance by Permit Type
Electrical3 rated
33.3% closed vs 60% median, 26.2 points lower
Building2 rated
50.0% closed vs 30% median, 20.1 points higher
Median based on all applicants with 20+ rated permits in each category. Only permits older than 1 year are rated.
Year-by-Year Summary
2023
0.0%
Open2
Closed0
0 closed / 2 rated
2017
66.7%
Open1
Closed2
2 closed / 3 rated
All Permits
5 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Open | E1529437 | Electrical Permit | 80 Pierce AVE, Dorchester | Oct 5, 2023 | Apr 5, 2024 | $10,000 |
| Open | ALT1506649 | Long Form/Alteration Permit | 80 Pierce AVE, Dorchester | Sep 12, 2023 | Mar 12, 2024 | $180,000 |
| Closed | SF771406 | Short Form Bldg Permit | 16 Alwin ST, Hyde Park | Nov 1, 2017 | May 1, 2018 | $28,500 |
| Closed | E767436 | Electrical Permit | 16 Alwin ST, Hyde Park | Oct 16, 2017 | Apr 16, 2018 | $4,200 |
| Open | E767441 | Electrical Permit | 80 Pierce AVE, Dorchester | Oct 16, 2017 | Apr 16, 2018 | $1,500 |